Utilisation is estimated from shifts or engine hours
Being switched on does not mean the vehicle is moving useful work.
Introducing RAMS AI Vision — Intelligent Warehouse Perception
Measure how forklifts and other material handling equipment move, wait and perform across the real operation. Identify utilisation gaps, empty travel, congestion, task delay and fleet imbalance — then turn the evidence into a prioritised improvement plan.
Know which assets work, wait or remain unused.
Empty travel, queues, backtracking and congestion.
Understand peak demand before adding or removing MHE.
Process, route, task, charging and allocation improvements.
The gap
WMS and ERP records show transactions. Rental schedules show fleet cost. Neither automatically explains how vehicle time is consumed on the floor.
Being switched on does not mean the vehicle is moving useful work.
Waiting may come from tasks, paperwork, charging, dock queues, blocked aisles or missing inventory.
Site-level totals hide vehicle imbalance, shift peaks and equipment-type constraints.
Repeated backtracking and empty travel add time without adding throughput.
Reports show output, but not the zone, route, queue or interaction that shaped it.
Assessment scope
The scope is agreed around site layout, shifts, MHE classes, operating rules and the decisions the customer needs to make.
How it works
A defined sequence prevents one unusual shift — or one attractive dashboard — from becoming the whole conclusion.
Agree questions, assets, shifts, KPIs and observation window.
Record routes, zones, tasks, interfaces and constraints.
Observe and collect vehicle, task and operational evidence.
Separate productive time, travel, waiting and availability.
Connect patterns to process, layout, fleet and shift causes.
Prioritise actions and define how results will be verified.
Time categories
RAMS separates time categories and operating context so teams can understand what is productive, what is necessary and what may be removable.
Productive handling
Time directly associated with defined load movement or completed operational work.
Supporting travel
Movement needed to position the MHE, including empty travel and return paths.
Operational waiting
Vehicle ready or active but held by a queue, process, interface or unavailable work.
Planned support
Necessary non-productive time required to keep the fleet safe and available.
Unplanned loss
Time removed from expected operation by breakdown, search, missing work or avoidable delay.
Not scheduled / not used
Available fleet capacity outside actual need for the observed period.
Evidence method
The assessment can be completed as a bounded study or strengthened with supported connected data. The chosen method depends on the question, existing systems and required level of detail.
Observed operational baseline
RAMS maps the physical operation, samples representative shifts, reviews task and fleet records, and verifies patterns with site teams.
Sensor-supported measurement
Where included, non-invasive supported devices and existing systems can extend the observation window and improve vehicle-level detail.
Decisions it supports
Right-size the fleet
Understand peak simultaneous demand, underused assets and required resilience before lease, purchase or transfer decisions.
Reduce empty travel
Identify repeated unloaded routes, backtracking and poor equipment placement that consume vehicle time.
Remove queue delay
Find waiting at docks, staging and process interfaces, then test a clearer release or sequencing rule.
Balance assets across shifts
Compare demand and equipment mix by shift, area and class instead of using a site-wide average.
Improve task allocation
Connect task gaps and response patterns to dispatch logic, availability and zone ownership.
Validate a proposed change
Define a before-and-after measurement for revised routes, charging, staging, slotting or work rules.
Deliverables
Outputs make the measurement basis visible and connect each priority to evidence, operational cause and a practical validation method.
Assets, shifts, window, formulas and exclusions.
Site, class, shift and asset-level views.
Productive, travel, waiting and support time.
Distance, empty travel and repeated patterns.
Zones, times, queues and operational context.
Peak need, underuse and class suitability.
Impact, confidence, dependency and owner.
Before-and-after measures for agreed actions.
Spend, time and effort directed by evidence
The assessment helps leaders distinguish additional capacity needs from process, layout, task or fleet-allocation problems.
Afterwards
The assessment can stand alone. Where continuous visibility is required, RAMS can carry the agreed measurement model into MEPS, the MHE Efficiency and Productivity System.
Establish the verified baseline
The assessment window, KPI rules and time categories become the reference the operation is measured against.
Monitor agreed productivity measures
Where the continuation is included, the same measures run on in MEPS rather than being redefined.
MEPS is an optional platform continuation, not a mandatory part of the assessment.
Questions
The right approach depends on the fleet decision, current systems, operating variability and required confidence.
No. RAMS can begin with a defined operational study using site observation, process mapping and available WMS, ERP, fleet or maintenance records. Sensors may be recommended where a longer window or higher vehicle-level detail is needed.
Share your site, MHE fleet, shifts and the decision you need to make. RAMS will define a practical assessment scope, evidence method and decision-ready output.